Cattle Shed Installation - Melton Mowbray
JOB SPECIFICS
Bulk excavation; 1000 tonne of soil removed and bunded
All rain water drains and service ducts installed
Ground graded and levelled
75mm limestone dispersed to a 150mm thickness
Top level finished off with type 1 limestone, ready for concrete to be poured